
ScottHarry launches Rising Trade Partners for emerging low-voltage, AV and controls firms
A year-long program that pairs small and emerging technology trade contractors with our project managers, commissioning leads and safety leaders.
Read
Field notes on speed to power, integrated testing and building inside live facilities, from the people who do the work.

A year-long program that pairs small and emerging technology trade contractors with our project managers, commissioning leads and safety leaders.
Read
Factory tests, startup and functional checks prove the parts. Only integrated systems testing proves the building. A field guide to the five levels and the traps between them.
Read
Data halls, control rooms, hospitals and operations centers do not close for construction. What it takes to build next to systems that cannot go down.
Read
Operator training, MOPs and SOPs, spares and as-built records, planned from preconstruction so the owner’s team can run the building the day we hand it over.
Read
Broadcast studios, a projection theater and immersive galleries, wired, tuned and accepted by the owner’s operators before the first audience arrived.
Read
Rack densities have jumped, water now runs to the row and the cooling plant is a process system. Builders who treat it like another air-cooled hall will find out at flush and fill.
Read
Temporary power, temporary cooling and trained crews staged ahead of storm season, so data centers, control rooms and other facilities that cannot stop are back online fast.
Read
Load banks on every row, utility pulled on purpose and every generator, UPS and chiller answering in sequence. A milestone earned by every trade on the campus.
Read
Enclosures set, inverters landed, the project substation built and the controls building wired. The plant now moves into commissioning ahead of its grid interconnection.
Read
The broadcast control room is energized, the fiber backbone is certified and the center-hung LED board is hanging, on a schedule built backwards from opening night.
Read
Cameras, sensors and sign gantries along the corridor were cut over to the new traffic management center overnight, one device group at a time, while the old center kept watch.
Read
For media inquiries, speaking requests or a conversation about your project, get in touch. We respond within one business day.