Plan · Sustainability

Efficiency you can measure, not just model.

We bring energy, carbon and waste into the same conversation as cost and schedule, then prove performance through commissioning, so the efficient building on paper is the efficient building you run.

Why it matters.

01

Power and cooling are the big bills

In technology-heavy buildings, the systems that keep equipment running use far more energy than the lights. Small losses in efficiency add up every hour of every year.

02

Embodied carbon is spent early

Concrete, steel and equipment choices made in design and procurement lock in most of a building’s carbon long before it opens.

03

Untested systems waste energy

A building that never had its controls tuned or its sequences verified can run inefficiently for decades without anyone noticing.

Our approach

How we work.

  1. 01

    Efficiency in design reviews

    We review cooling strategies, equipment selections and controls sequences with the engineers, and price the options so efficiency is a decision, not a hope.

  2. 02

    Embodied carbon comparisons

    Structural and envelope options are compared by carbon as well as cost, using supplier environmental product declarations where they exist.

  3. 03

    Low-carbon concrete

    We test mixes with supplementary cementitious materials with the ready-mix supplier and the engineer, matching strength and cure time to the pour schedule.

  4. 04

    Waste diversion

    Separated streams, recycling haulers and packaging take-back, with monthly tickets that show where every load went.

  5. 05

    Commissioning that proves it

    Functional and integrated systems testing verifies every sequence, setpoint and alarm, so the building runs the way it was designed on Day One.

What you receive.

Every engagement is scoped to the project. These are the core outputs owners can expect.

Efficiency options logDesign

Priced alternatives for cooling, power and controls with their operating effect.

Carbon comparisonStructure and envelope

Embodied carbon and cost side by side for the major material choices.

Waste diversion reportsMonthly

Hauler tickets and diversion totals by material stream.

Certification backupRating systems

Construction-phase documentation organized for the rating system your project is pursuing.

Commissioning recordTurnover

Test results, issue logs and closed corrections for every commissioned system.

In practice · University Research Computing Center

Liquid-cooled racks, tuned before fall semester.

A high-performance computing hall puts a lot of heat in a small space. Under one design-build contract we worked with the engineers on a liquid-cooled rack strategy, staged the cooling plant so capacity matched each phase of rack delivery, and ran every pump, valve and controls sequence through functional testing before researchers logged on.

64,000
Square feet of computing and labs
1
Design-build contract
2023
Energized for the fall semester

Questions owners ask us.

Do efficient choices cost more?

Some do and some save money. We price each option with its operating effect so you can decide with the whole picture in front of you.

Will low-carbon concrete slow the schedule?

Not if it is planned. Some mixes gain strength more slowly, so we test them early and use them on pours where cure time is off the critical path.

Can you support a green building certification?

Yes. We manage the construction-phase requirements and documentation for the rating system the owner and design team select.

Sustainability

Talk to the people who will build it.

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.