Wilmington, Delaware · Since 2021 Field-first general contractor · Mission-critical builds CareersNewsroomPrequalifyProject map
Civil & Infrastructure · Water & Environmental

Water that keeps flowing.

Pump stations, treatment plants, SCADA networks and the power that drives them, rebuilt while the system keeps delivering. Every control panel and radio link is proven before operators trust it.

What owners need from us.

01

Service cannot stop

Customers need water every hour of construction. Bypasses, tie-ins and shutdowns are planned so delivery and permits are never at risk.

02

Controls are the new pipe

Modern plants run on SCADA, PLCs and communications. A pump that cannot be seen or controlled from the operations room is a pump at risk.

03

Startup is the finish line

A station is not done when the concrete cures. Equipment, controls and alarms have to be started and proven together.

Water & Environmental

What we build.

  1. 01

    Pump station modernizations

    New pumps, drives, electrical gear and standby power installed while stations stay in service.

  2. 02

    SCADA and controls networks

    Control panels, PLCs, radio and fiber links that bring every site onto one network.

  3. 03

    Treatment plant upgrades

    Process equipment, electrical buildings and instrumentation for water and wastewater plants.

  4. 04

    Storage and conveyance

    Reservoirs, tanks, transmission mains and force mains.

How we deliver here.

The capabilities owners in this market rely on most.

Engineer-Procure-Construct (EPC)Deliver

One contract from design through startup and performance testing.

MEP Coordination & CommissioningBuild

Instrumentation, controls and SCADA integrated and tested before each station is cut over.

Self-Performed ConstructionBuild

Our own crews for concrete, electrical buildings and yard piping.

Preconstruction & EstimatingPlan

Phased tie-in plans and estimates that support funding applications.

In practice · Pump Station & SCADA Modernization

Six stations re-powered, not one missed delivery.

Six pump stations were re-powered and brought onto one control network under an EPC contract. Each station got new electrical gear, standby power and control panels with temporary pumping in place, and was tested from the panel to the operations room before the next one was taken down.

6
Pump stations
EPC
Delivery
2023
Completed

Questions owners ask us.

How do you keep water moving while a station is rebuilt?

We plan every shutdown with operators, set temporary pumping where needed and schedule critical tie-ins for low-demand hours.

Do you handle SCADA integration and startup?

Yes. We coordinate with the utility’s controls team and integrator, test every point from the field device to the operations screen and stay through startup.

Can you work on projects funded by state revolving fund loans?

We can. We set up the reporting, sourcing and wage tracking those programs require before the first purchase order.

Water & Environmental

Planning a water & environmental project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.