Wilmington, Delaware · Since 2021 Field-first general contractor · Mission-critical builds CareersNewsroomPrequalifyProject map
Energy · Renewable Energy

Storage that answers the grid.

Battery energy storage plants, solar and hybrid sites, substations and controls buildings, delivered from first foundation to energization by teams who plan backward from the interconnection date.

What owners need from us.

01

The interconnection date rules

Grid access, offtake contracts and tax credit timing hang on one energization date. Missing it costs more than any line item.

02

Storage is a controls job

Battery plants are only as good as their power conversion, plant controller and communications with the utility. Integration is tested before energization.

03

Fire safety is designed in

Spacing, detection, suppression and emergency response plans are part of every storage site and have to be built exactly as approved.

Renewable Energy

What we build.

  1. 01

    Battery energy storage

    Enclosure foundations, power conversion, fire protection and medium-voltage collection.

  2. 02

    Utility-scale and hybrid solar

    Piles, trackers, modules and DC collection paired with storage on one site.

  3. 03

    Project substations and tie lines

    Step-up substations, gen-tie lines, protection and metering the utility needs to accept power.

  4. 04

    Controls and O&M buildings

    Control houses, SCADA, communications and the buildings that run the plant.

How we deliver here.

The capabilities owners in this market rely on most.

Engineer-Procure-Construct (EPC)Deliver

Turnkey EPC from geotechnical work through energization and commercial operation.

MEP Coordination & CommissioningBuild

Plant controls, SCADA and protection integrated and tested with the utility.

Supply Chain ManagementPlan

Battery enclosures, inverters and main power transformers tracked from factory to laydown.

Civil & InfrastructureBuild

Grading, access roads, foundations and storm water controls on large, exposed sites.

In practice · Battery Energy Storage Facility

A four-hour battery plant, energized on date.

The battery energy storage facility was built under an EPC contract. Enclosure foundations, power conversion and the project substation went in together, the controls building and plant controller were tested with the utility, and the grid interconnection was energized on the scheduled date.

150 MW
Power
600 MWh
Storage
EPC
Delivery

Questions owners ask us.

How do you keep a storage project on schedule?

We plan backward from interconnection, release transformers and enclosures early and run foundations, collection and the substation in parallel.

Do you build the substation and controls too?

Yes. We build the project substation and controls building and coordinate protection and communications testing with the utility so the plant can energize on time.

Can you add storage to an existing solar plant?

Yes. We plan storage additions around the operating plant, with foundations, conversion equipment and tie-ins scheduled to limit lost generation.

Renewable Energy

Planning a renewable energy project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.