Storage that answers the grid.
Battery energy storage plants, solar and hybrid sites, substations and controls buildings, delivered from first foundation to energization by teams who plan backward from the interconnection date.
What owners need from us.
The interconnection date rules
Grid access, offtake contracts and tax credit timing hang on one energization date. Missing it costs more than any line item.
Storage is a controls job
Battery plants are only as good as their power conversion, plant controller and communications with the utility. Integration is tested before energization.
Fire safety is designed in
Spacing, detection, suppression and emergency response plans are part of every storage site and have to be built exactly as approved.
What we build.

- 01
Battery energy storage
Enclosure foundations, power conversion, fire protection and medium-voltage collection.
- 02
Utility-scale and hybrid solar
Piles, trackers, modules and DC collection paired with storage on one site.
- 03
Project substations and tie lines
Step-up substations, gen-tie lines, protection and metering the utility needs to accept power.
- 04
Controls and O&M buildings
Control houses, SCADA, communications and the buildings that run the plant.
How we deliver here.
The capabilities owners in this market rely on most.
Turnkey EPC from geotechnical work through energization and commercial operation.
Plant controls, SCADA and protection integrated and tested with the utility.
Battery enclosures, inverters and main power transformers tracked from factory to laydown.
Grading, access roads, foundations and storm water controls on large, exposed sites.

A four-hour battery plant, energized on date.
The battery energy storage facility was built under an EPC contract. Enclosure foundations, power conversion and the project substation went in together, the controls building and plant controller were tested with the utility, and the grid interconnection was energized on the scheduled date.
- 150 MW
- Power
- 600 MWh
- Storage
- EPC
- Delivery
Questions owners ask us.
How do you keep a storage project on schedule?
We plan backward from interconnection, release transformers and enclosures early and run foundations, collection and the substation in parallel.
Do you build the substation and controls too?
Yes. We build the project substation and controls building and coordinate protection and communications testing with the utility so the plant can energize on time.
Can you add storage to an existing solar plant?
Yes. We plan storage additions around the operating plant, with foundations, conversion equipment and tie-ins scheduled to limit lost generation.

Planning a renewable energy project?
Share the project, the site and the date that matters. A senior builder will come back to you within one business day.