Wilmington, Delaware · Since 2021 Field-first general contractor · Mission-critical builds CareersNewsroomPrequalifyProject map
Healthcare · 2024

Hospital Imaging & Data Wing

A new imaging and data wing plugged into a hospital that never once went dark.

Owner
Confidential
Location
U.S.
Market
Healthcare
Delivery
CM at-risk
Scale
118,000 SF
Completed
2024
The brief

A new imaging and clinical data wing tied into a hospital that stayed open, with MRI suites, a hardened server room and zero unplanned downtime.

The hospital needed MRI and CT suites, a hardened clinical server room and new imaging support space, attached to a building that runs around the clock. Every new feeder, chilled water line and fiber path had to tie into live systems serving patients on the other side of the wall. A missed tie-in here is not a schedule problem. It is a patient problem, and the image archive and clinical network could not lose a single minute.

How we built it

The approach.

  1. 01

    Tie-ins written as MOPs

    Each shutdown had a method of procedure signed by hospital engineering, a rehearsal walk the week before and a back-out plan timed to the minute.

  2. 02

    Magnets and steel kept apart

    MRI shielding, quench vent routes and the magnet delivery path were set in the model first, then every nearby duct and hanger was checked against the field.

  3. 03

    A server room built like a data hall

    Dual-corded racks, A/B UPS feeds, in-row cooling and a fiber backbone to the existing core were load-bank tested before a single clinical system moved.

  4. 04

    Cutover on a quiet night

    The archive and clinical network migrated in a scripted overnight window with IT, vendors and our crew on one bridge call until every system checked green.

The outcome.

118,000Square feet tied into a live hospital
0Minutes of unplanned downtime
100%Racks load-bank tested before cutover
Day OneFirst patients scanned on the opening date

“Nobody inside a hospital should ever feel the construction. The best tie-in is the one the night nurse never noticed.”

Project executive, ScottHarry
Healthcare

Planning something like this?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.