Wilmington, Delaware · Since 2021 Field-first general contractor · Mission-critical builds CareersNewsroomPrequalifyProject map
Civil & Infrastructure · Highways & Roads

Roads that report back.

Smart corridors, traffic management centers, fiber backbones, sign gantries and the roadwork around them. We build under live traffic and test every camera, sensor and sign before the corridor goes live.

What owners need from us.

01

Traffic never stops

Commuters, freight and emergency vehicles use the corridor every hour we work on it. Maintenance of traffic is the plan, not an add-on.

02

Closures are measured in hours

Night windows for gantry sets and fiber crossings are short and permitted in advance. Miss the reopening time and the penalty starts at dawn.

03

Every device has to talk

Cameras, detectors, message signs and controllers are only useful when they reach the traffic center. Fiber, power and integration are tested end to end.

Highways & Roads

What we build.

  1. 01

    Smart corridor technology

    Fiber backbones, cameras, vehicle detection, dynamic message signs and roadside cabinets.

  2. 02

    Traffic management centers

    Operations rooms with video walls, consoles, redundant power and network paths.

  3. 03

    Sign gantries and structures

    Foundations, gantry steel and overnight sets over live lanes.

  4. 04

    Corridor and interchange work

    Pavement, drainage, lighting and signals built in stages under traffic.

How we deliver here.

The capabilities owners in this market rely on most.

Design-BuildDeliver

One team for design and construction, so device placement and traffic staging shape the plans from the start.

Civil & InfrastructureBuild

Duct bank, directional boring, foundations and paving by crews who work beside live lanes.

MEP Coordination & CommissioningBuild

Device power, communications and integration with the traffic center tested before acceptance.

Virtual Design & ConstructionPlan

Drone surveys and 3D models of utilities, device locations and traffic stages.

In practice · Smart Corridor & Traffic Management Center

Twenty-six miles of corridor, one control room.

The smart corridor was delivered design-build. Fiber, cameras, sensors and sign gantries went in along 26 miles of a busy corridor under night closures, and every device was integrated and tested with the new traffic management center before the agency took control of the system.

26
Corridor miles
Design-build
Delivery
2024
Completed

Questions owners ask us.

How do you keep traffic moving during construction?

We build the maintenance of traffic plan with the design. Every stage has a lane layout, a detour plan and a reopening time agreed with the agency.

Do you handle device integration with the traffic center?

Yes. We coordinate with the agency’s systems team and integrator, test each device from the cabinet to the video wall and turn over a complete as-built and device inventory.

How do you protect existing utilities and fiber in the right of way?

We locate utilities early, pothole before boring and sequence crossings so crews never work blind beside a live line.

Highways & Roads

Planning a highways & roads project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.