Power plants behind the meter.

Dedicated generation plants, switchyards, fuel systems and backup power for data campuses and industrial sites that cannot wait on the grid. We build, test and commission them so the load they serve never notices a transfer.

What owners need from us.

01

The load is waiting

Data halls and process lines are scheduled around the day power is available. On-site generation often sits on the critical path for the whole campus.

02

Transfers must be invisible

Plant, grid and backup sources have to hand off cleanly. Protection settings, controls and switching sequences are tested before the load depends on them.

03

Fuel and hazards are live

Gas lines, fuel storage, hot work and energized gear demand permits, isolation and gas testing built into the daily plan.

Energy Infrastructure

What we build.

  1. 01

    On-site generation plants

    Reciprocating engines and turbines, foundations, stacks, cooling and the controls that tie them together.

  2. 02

    Switchyards and medium-voltage distribution

    Switchgear, transformers, duct bank and protection that carry power to every building on site.

  3. 03

    Fuel and gas systems

    Gas service, fuel storage, piping and safety systems built to code and tested before first fire.

  4. 04

    Backup and standby power

    Generator plants, paralleling gear and transfer schemes for facilities that cannot lose power.

How we deliver here.

The capabilities owners in this market rely on most.

Engineer-Procure-Construct (EPC)Deliver

Lump-sum EPC with one team carrying engineering, long-lead procurement and field execution.

MEP Coordination & CommissioningBuild

Protection, controls and transfer sequences commissioned under load before turnover.

Design-Manufacture-InstallDeliver

Skids, enclosures and pipe spools fabricated off site so field hours drop.

Supply Chain ManagementPlan

Engines, switchgear and transformers expedited and witness-tested at the factory.

In practice · On-Site Power Plant for a Data Campus

120 MW of generation built for a data campus.

The on-site power plant was delivered under an EPC contract. Generation units, a switchyard and a fuel system were built alongside the data campus they serve, protection and transfer schemes were tested with the grid connection, and the plant was commissioned to carry the campus and back up the utility feed.

120 MW
Plant capacity
EPC
Delivery
2026
Completed

Questions owners ask us.

Can you build generation and the facility it serves at the same time?

Yes. We run one schedule for the plant and the load, so power is available when the halls or process lines are ready for it.

How do you test transfers between plant, grid and backup?

We test protection and controls in stages, then run planned transfers with the owner, the utility and the commissioning agent before the load is live.

How do you manage fuel and energized work hazards?

Every task runs under a permit system with job hazard analysis, gas monitoring where required and verified isolation before any line or gear is opened.