Wilmington, Delaware · Since 2021 Field-first general contractor · Mission-critical builds CareersNewsroomPrequalifyProject map
Operate · Disaster Response

Built to stay on when it storms.

Hardened facilities, readiness agreements and crews on call, so critical operations stay up through the event, and come back fast when something does go wrong.

Why it matters.

01

The first hours decide the cost

Water, exposure and lost power do more damage every hour. Fast stabilization limits what has to be rebuilt and how long operations stay down.

02

Everyone needs help at once

After a regional event, crews, generators and materials are in short supply. Owners without agreements in place wait in line.

03

Critical services come first

Dispatch centers, grid control, water systems and hospitals have to stay on or come back first. Their resilience is built long before the storm.

Our approach

How we work.

  1. 01

    Resilience built in

    Hardened envelopes, raised equipment, redundant feeds, on-site generation and fuel storage designed and tested during construction.

  2. 02

    Pre-positioned agreements

    Scope, rates and call-out steps set with owners in advance, so mobilization starts with a phone call instead of a procurement process.

  3. 03

    Emergency stabilization

    Crews secure damaged structures, dry in openings and restore temporary power, cooling and connectivity to critical areas.

  4. 04

    Temporary facilities and power

    Temporary generation, modular space and temporary network connections so essential services keep running during repairs.

  5. 05

    Rapid rebuild

    Design-build teams assess damage, scope permanent repairs and rebuild to current codes, with resilience upgrades priced as options.

What you receive.

Every engagement is scoped to the project. These are the core outputs owners can expect.

Readiness agreementPre-event

Agreed scope, rates, contacts and mobilization steps, reviewed with you each year.

Site response planFirst 72 hours

Priorities, access routes, staging areas and critical systems for each facility you want covered.

Damage assessmentDocumented

Photo, drone and field records of damage, with a prioritized scope for stabilization and repair.

Cost and quantity recordsFunding-ready

Daily logs of labor, equipment and materials organized for insurance and public assistance claims.

Rebuild scheduleRecovery

A phased plan that brings critical spaces back first and closes out permanent repairs.

In practice · Regional Emergency Communications Center

A 911 center that stays on the air.

A regional dispatch center has to keep answering calls through storms, outages and everything in between. The design-build team hardened the envelope, built redundant power with on-site generation and fuel, protected the antenna and network paths, and tested every transfer under load before dispatchers moved in.

42,000
Square feet
24/7
Dispatch operations
2024
On the air

Questions owners ask us.

How fast can you mobilize after an event?

It depends on the event and the location. Owners with a readiness agreement move to the front of our response plan, with crews and equipment staged as soon as it is safe.

Can you make an existing facility more resilient?

Yes. We assess power, cooling, envelope and connectivity risks and price upgrades such as raised equipment, added generation or redundant feeds, then build them while the facility stays in operation.

Do you help with insurance and public funding documentation?

Yes. We track labor, equipment, materials and debris daily in the format adjusters and public agencies expect.

What does a readiness agreement cost?

Setting one up is a planning exercise. We agree the terms up front, and response work is billed at the agreed rates only when it is needed.

Disaster Response

Talk to the people who will build it.

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.