Ready for operations on Day One.
Data centers, technical facilities and critical infrastructure, built by a team that lives on site. Every rack, cable and system installed to spec, tested and commissioned before you take the keys.
- L1Factory witness tests
- L2Delivery and set inspections
- L3Pre-functional and start-up
- L4Functional performance tests
- L5Integrated systems test
We
plan it,
build it and
prove it works. Since 2021, technology-dependent owners have trusted ScottHarry with the buildings that cannot fail.
- 2021
- Building since
- 14
- Delivery capabilities
- 22
- Markets served
- 4
- Sectors
A field-first general contractor from Wilmington, Delaware. Constructability, site logistics, quality assurance and operational readiness, led by people who are on site every day.
About ScottHarryFour things we do better than anyone on site.
Our core services sit where buildings meet technology. That is where schedules slip, trades collide and handovers fail. It is also where we do our best work.
01Data Center ConstructionHyperscale, colocation, edge and liquid-cooled AI halls. White space, power and cooling built in the order the commissioning plan needs them.Explore
02Mission-Critical BuildsDispatch centers, control rooms, operations centers and hardened facilities that cannot go dark, built and tested for the worst day.Explore
03Technical Interior Build-OutsTrading floors, technology rooms, AV-rich workplaces and labs built inside live buildings, floor by floor, without disrupting the people next door.Explore
04MEP Coordination & CommissioningMechanical, electrical, low-voltage, AV, networking and security on one schedule, proven through Level 1 to Level 5 and integrated systems testing.Explore Commissioned, not just completed.
Hospital Imaging & Data WingA new imaging and clinical data wing tied into a hospital that stayed open, with MRI suites, a hardened server room and zero unplanned downtime.
Digital Media Arts CenterBroadcast studios, a projection theater and immersive galleries, wired, tuned and tested before the first audience arrived.
Live-Events Arena & Broadcast HubA live-events arena with a center-hung LED board, a fiber backbone and a broadcast hub that went live on opening night.
Federal Cyber Operations CenterA secure operations center with accredited spaces, a 24/7 watch floor and redundant power and cooling behind every screen.
Airport Operations Center & Baggage ControlsA new operations center and baggage controls upgrade, cut over overnight while every flight kept moving.
Hyperscale Data Center CampusTwo data halls, a central utility yard and an integrated systems test that proved every megawatt before the first customer rack arrived.
Battery Energy Storage FacilityA four-hour battery storage plant with its own substation, controls building and a grid interconnection energized on date.
Mixed-Use Tower & Edge Data CenterOffices, homes and street retail stacked over an edge data center that serves the tower and the blocks around it.
University Research Computing CenterA high-performance computing hall, liquid-cooled racks and research labs under one roof, energized for the fall semester.
STEM Innovation AcademyA connected middle and high school with robotics labs, makerspaces and a network built to carry every classroom from day one.
“We are the builders that technology-dependent clients trust when failure is not an option.”
I founded ScottHarry to do what I do best: lead complex builds from ground-breaking to handover. For 20 years I have managed construction in live, high-stakes environments, from data centers to technical facilities and commercial infrastructure. My team and I are on site, making sure every rack, cable and system is installed to spec, tested and commissioned correctly.
From ground-breaking to handover.
Fourteen capabilities that work as one system. Bring us in at the first estimate, at the first cable pull, or when a live facility needs to stay live while we build.
- General Contracting
- Construction Management
- Design-Build
- Engineer-Procure-Construct (EPC)
- Design-Manufacture-Install
Wherever uptime is the job.
Four sectors and twenty-two markets. Different buildings, same rule: the systems inside have to work the first time.
Everyone home safe. Every day.
In a live data hall or an energized switch room, safety and quality are the same discipline. Every crew plans the work, every worker can stop it, and nothing is energized until it has been proven.
Buy it the way that fits the risk.
Every owner, budget and schedule is different. We deliver under every major contract model, and we will tell you plainly which one suits your project.
General contracting
- How risk is shared
- Builder holds cost and schedule risk once design is complete
- Best for
- Fully designed projects that need a firm price
CM at-risk
- How risk is shared
- Builder joins during design and commits to a guaranteed maximum price
- Best for
- Complex or phased work where early input saves money
Design-build
- How risk is shared
- One contract for design and construction, so there is one point of accountability
- Best for
- Owners who want speed and a single team to answer to
EPC
- How risk is shared
- Builder engineers, buys and builds for a lump sum and a performance guarantee
- Best for
- Energy, process and industrial facilities
Design-manufacture-install
- How risk is shared
- Components are designed for fabrication, made off site and installed by our crews
- Best for
- Repeatable spaces and tight sites, where schedules are short
Public-private partnership
- How risk is shared
- Design, build, finance and sometimes operate, under one long-term agreement
- Best for
- Public owners delivering essential infrastructure
Critical work needs critical partners.
Electrical, mechanical, low-voltage, AV, networking and security firms, suppliers and joint-venture partners. If your crews install to spec and test their own work, we want to build with you.
Partner with us
Let’s get you to Day One.
Share the project, the site and the date that matters. A senior builder will come back to you within one business day.